C.22.2:2.2 - Required Solution Use
The Solution turns observed signal material into one C.2.1 episteme and one governed next use, not a completed form.
- Capture the symptom, anomaly, risk, stakeholder cue, drift, hypothesis, or other observed signal before naming an actual Problem.
- Recover the one joint EntityOfConcern, effective ReferenceScheme, ClaimScope, and claim family. If the claims concern unrelated entities, split the ClaimGraph and card.
- Separate the signal detector, actual-PFR assertion if independently grounded, anticipated-condition claim, improvement check, candidate acceptance criterion, method-availability claim, monitored risk signal, and proxy-distortion risk. These are not one card status or one PFR participant set.
- Pay only for current complexity. Add conditional content only when it changes the current next use; otherwise stop at the lighter card or name the direct pattern for the claim now current.
- If the formulation changes EntityOfConcern, effective scheme, ClaimScope, diagram, functional description, or transformation-flow interpretation, name the representation-transition, retargeting, Bridge, structural-reinterpretation, or wording-use relation before inheriting an earlier card disposition.
- Close by the honest next use. A filled card without a truthful next use is not a successful result.
Cheap stop. The smallest card that gives a truthful next use is sufficient. A conforming use does not require heavier fields merely because the full inventory exists.
First practitioner use. State the signal, joint EntityOfConcern, scheme, scope, claim family, not-wish reason, improvement check or acceptance probe, and honest next use. Open the relation-boundary aid only when another claim or relation changes that move.