Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 13:50:10 UTC

C.22.2:23 - Downstream Cue Export

ProblemCard exports problem-side claim content, not authority over downstream use.

The compact export contains:

  • problem signal and exact signal reference;
  • one joint EntityOfConcern, effective ReferenceScheme, and ClaimScope;
  • exact claim family and polarity: actual-PFR assertion, anticipated-condition claim, method-availability or solvability claim, or another named direct claim;
  • reason this is not merely a wish, ticket, slogan, label, or preselected Work request;
  • improvement check or acceptance probe;
  • one honest next use and its disposition: reviewable-only, P2W-ready, abstainOrNoChange, refresh, retire, archive, or subject-pattern cue;
  • current qualification window, exact PFR, source-set, A.15.6 composite or component Work, or representation reference only when independently governed and relied on; and
  • problem-formulation follow-up reason, validation boundary, freshness condition, and stop only when the receiving use relies on them.

For P2W carry-through, use E.18.1 with the accepted problem-side distinctions. For TaskSignature constitution and assignment, use C.22. For selected-set or search use, apply G.5 only when that relation is current. For intended or performed Work, use A.15 only after its exact object is current; when the question is whether intended Work may enter its boundary, A.15.5 governs WorkEntryReadiness@Context. For evidence, gate, autonomy, or any other claim, apply the direct pattern; the whole card never carries that claim by itself.