Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 13:25:20 UTC

C.22:13 - Relations

Builds on: C.16 MM-CHR, G.0 CG-Spec. Coordinates with: G.4 Acceptance, G.5 Selector, C.18 NQD-CAL, C.19 E/E-LOG, C.23 Method-SoS-LOG, and C.32.P2S when typed problem pressure continues into architecture selected structures and synthesis. Constrained by: E.10 for selected EntityOfConcern, Description-episteme, specification-use, and publication-lane wording. Coordinate with E.18 only when a named receiving use depends on a selected transformation-flow crossing or gate position; E.18 supplies neither the F.9 Bridge nor a mandatory publication package.