Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 14:36:52 UTC · snapshot created 2026-10-03 14:38:14 UTC · last check 2026-10-03 14:40:20 UTC

C.30.AD.BA:8 - Relations

  • Specializes: C.30.AD for built-asset architecture-description use.
  • Uses architecture and structure patterns: C.30, C.30.ASV, A.22, A.6.F, A.6.M, C.30.TFS-REL, and C.30.LCA.
  • Uses description, view, representation, and publication patterns: C.2.1, A.7, E.17.0, E.17, E.24.PUB, and C.29.
  • Uses relation, naming, and currentness patterns: the exact designation/reference predicate and assertion; A.6.P for precision repair; A.6.RCD only for a demonstrated missing reusable predicate; A.6.REL only after the relation kind is admitted, current facts satisfy its obtaining predicate, and occurrence identity matters; F.18; and G.11.
  • Uses lifecycle information-management source discipline from: exact published ISO 19650-1:2018 and ISO 19650-3:2020 editions through source-to-use, edition, currentness, source-return, and admissible-use boundaries, without ontology or authority import.
  • Records design/run separation in: one local BuiltAssetDesignRunSeparationUse over exact C.2.1 descriptions, A.15.1 Work, source-use paths, G.11 currentness, directly governed correspondence or coupling, and A.3.4 transformation refs; the local classification admits no kind or relation.
  • Use for auxiliary-view claims: C.16 for characteristic measurement, A.15.1 for operation or maintenance Work, C.27.TA for positive temporal aspects, C.27 for action-guiding temporal-claim adequacy, C.28 when an intervention, maintenance action, simulation, telemetry change, or claimed effect is used causally, A.10 for evidence or material reliance, B.3 for assurance, and G.11 for currentness and reopen conditions.
  • Use for gate- and release-looking claims: A.21 when a named gate must decide a bounded action or its GateDecisionResult is being relied on; the display remains a cue until the required result is established. Route a release action or other performed Work to A.15.1, work-entry readiness to A.15.5, a permission result or exercise to A.2.8.PER, an instituting or revoking grant act to A.2.9, and a subject-release claim to its named predicate and participants or A.6.RCD missing-governor; none of these claims entails another.
  • Use for other claims: A.3.4 and the direct transformation, evaluation, evidence, assurance, Work, decision, acceptance, or project-use pattern named by the claim.