C.31.ASAP:5.1 - Filled triage slice
ScaleClaimTriage:
architectureAlternativeSetRef: product-line platform alternative vs bespoke customer-specific variants
describedHolonRef: the regulated deployment platform and its site-specific variants
claimScopeRef: preference claim for 5 to 40 named regulated deployment sites inside the current qualification boundary
selectedContextSliceRefs: the named site, jurisdiction, and qualification-window slices admitted by that claim scope
modelUseStructureRef?: absent; no independently selected bounded-model-use structure changes this use
scaleVariableRef: N_sites
scaleWindowRef: 5 to 40 regulated deployment sites inside the current qualification window
claimedPreferenceUnderScale: platform alternative is preferred if interface variants and approval exceptions grow slower than bespoke variants
slopeEvidenceRef, scaleProbeEvidenceRef, or noProbeReason: scale-probe evidence from six deployments; no universal scale law claimed
expectedStableOrImprovingStructure: interface grammar, reusable test package, deployment work template
exceptionGrowthRisk: jurisdiction-specific clauses and side-channel integrations may grow faster than sites
sourceReturnCondition: return to exception register, interface variant log, and deployment evidence before publication, selected-set, assurance, or decision use
relatedClaimGovernanceIfClaimed: C.31 for the characteristic; C.31.RSA for reusable-structure share; C.16 for measurement; A.19.CPM for comparison; G.5 for selected-set declaration; G.9 for parity; C.11 for local decision; A.10 for source recovery and bounded reliance; G.6 for addressable provenance; B.3 for a named assurance claim
stopCondition: stop at local scale-preference guidance unless comparator admission, evidence validity, and decision or selected-set governance are present
Admissible move: prefer the platform alternative as a local scale-preference guide and start interface-grammar repair before deployment spread increases. Stop at local guidance; open the direct selected-set, evidence-sufficiency, assurance, gate, or decision pattern only when that downstream claim is current.