Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 14:36:52 UTC · snapshot created 2026-10-03 14:38:14 UTC · last check 2026-10-03 15:15:10 UTC

C.32.ACE:7 - Conformance requirements

RequirementRequired result
CC-ACE-1Every eval references declared ACS rows or C.25 Q-Bundle slots.
CC-ACE-2Every eval names evaluated candidates, bearers, or selected structures.
CC-ACE-3Purpose, parity frame, scope, eval operation, trigger mode, result form, and run context are explicit.
CC-ACE-4Measurement claims require C.16; composite quality claims require C.25.
CC-ACE-5Proxy risk, missing-data policy, and protected counter-characteristics are named before a receiving synthesis, comparison, or selection pattern uses the eval result.
CC-ACE-6Source-side “fitness function” wording is not used as the FPF object name in the record.
CC-ACE-7A check or test is admitted only as one eval operation when an expectation or hard constraint is being inspected.
CC-ACE-8The eval result does not select, decide, certify, or carry an architecture-adequacy claim by itself.
CC-ACE-9A project-local program names both projectWorkOccurrenceRef and architectureEvalProgramProjectUseRelationRef; the suffix or either reference alone asserts no locality.
CC-ACE-10The record separately identifies any reusable Method, MethodDescription, planned evaluation, dated evaluation Work, actual operation application, and typed result that the use needs; evalOperation or resultForm supplies none of those occurrences or identities.
CC-ACE-11Every actual evaluation use binds one exact U.ClaimScope, relevant A.2.6 U.ContextSlice membership, effective reference scheme and plane, evaluation window, and input projections; evalScope, runContext, and parityFrameRef do not replace them.