Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 12:45:07 UTC

C.32.P2S:6 - Bias-Annotation

Use these rows as repair cues for problem pressure, source-practice transfer, or observed signals, not as a catalogue of mistakes.

Pressure cue or source-practice rowRisk in P2S useRepair
Description-first pressure cueA view, model, diagram, ADR-like record, dashboard, or memo starts to carry architecture, decision, and work authority at once.Recover selected structures and current use. Use C.30.AD or C.30.ASV for description adequacy, C.32.PAD for decisions, C.32.ADR for projections, and A.15-family patterns for work claims.
Single-winner pressure cueA score, workshop favorite, generated candidate, or apparent best alternative hides structurally different candidates.Restore candidate plurality through C.32; keep archive, front, pool, selected-set, comparison, local-choice, or decision use with its applicable pattern.
Eval-shaped practice row or signalA metric, benchmark, source-practice fitness-function term, eval result, or telemetry event is treated as the characteristic or the decision.Recover characteristic, bearer, scale, eval program, measurement, and receiving use. Use C.32.ACE, C.16, C.25, and then the applicable comparison, selected-set, local-choice, or decision pattern.
Architecture-influence basis hiddenDesired transformed-side architecture content is stated without asking which typed Work, communication, tool, method, deployment, evidence, selected-structure, or architecture-side source constrains it.Open C.32.CONWAY; keep the changed referent and any actual transformation separate, recover both exact C.30 architecture sides or their modal claims, name every influence source by kind and either its exact obtaining direct relation or precise provisional disposition, and prepare influence-source-side, transformed-side, joint, and bounded-mismatch candidates.
Work-shaped pressure cueA schedule, task list, method recipe, performed-work record, shared assembly occurrence, or completion label is treated as the architecturing flow, an actual transformation, a composite transformation, or proof that selected structure is actual.Keep the A.15-family distinctions intact. The P2S card may cite Work occurrences, independently grounded changes, Work-to-change relations and their rules, separate local A.15.PROD claims, and actual-structure facts only when they obtain; common work or chronology supplies none of the stronger claims.