Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 08:25:59 UTC · snapshot created 2026-10-03 08:26:43 UTC · last check 2026-10-03 10:00:09 UTC

C.32.PAD:4.1 - Decision readiness

A C.32.PAD decision is ready to draft when the current decision relation identifies the composite project U.Work participant and can cite at least one candidate basis, one affected selected structure, one architecture-characteristic trade-off or declared reason for no live trade-off, one expected work consequence, one reopen condition, and any triggered holonTransitionOrBOSCTriggerRefs? or structuralInformationLensUseRefs? needed to preserve source return. When system-of-interest local-kind, separate System-classification, assignment, architecture-influence, or network fields are present, the applicable A.15.6, A.2 and A.2.1, C.32.CONWAY, E.18.NET, and C.30.TFS-REL preconditions must already be satisfied or the reference remains absent.

If the candidate basis is absent, require C.32. If architecture-characteristic rows are absent, require C.32.ACS or C.25. If the decision only says “the metric is best”, require C.32.ACE, C.16, or A.19.CPM before deciding. If the intended work method is not recoverable, require A.15. If an existing system, role assignment, project-network judgment, network selection, architecture use, or influence pair is unresolved, require its subject pattern and keep only the truthful designation, modal claim, candidate frame, or explicit stop in PAD.