Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 17:24:51 UTC · snapshot created 2026-10-03 17:30:20 UTC · last check 2026-10-03 19:10:05 UTC

E.10.MOVE:5.7 - Manufacturing operation

Source sentence: “The next move is to heat-treat the shaft.”

If this names the reusable way of changing the shaft, recover the U.Method and its description under A.3.1 and A.3.2. If it places a heat-treatment operation in intended work, recover the WorkPlan or PlanItem under A.15.2. If heat treatment has occurred, recover the dated A.15.1 Work occurrence, affected shaft, method enactment, and result. If the question is whether that intended work can start, recover A.15.5 work-entry readiness. If the receiving context does not select among them, return the blocker: “Specify whether this describes the heat-treatment method, plans the work, reports completed heat treatment, or asks whether the planned work can start.”