E.11.PUA:5.2 - Physical result: work is still future
A machining team applies a planning pattern for a dimensionally accepted component and states one exact U.WorkPlan under A.15.2. If it claims that planning Work first constituted that plan episteme, cite the local A.15.PROD inception claim. The metal blank remains unchanged.
The plan is the result at the selectedPatternApplicationFlowResult position and keeps its A.15.2 identity. The component remains an open downstreamSubjectWorkFlowResult expectation until dated machining Work occurs. The team may continue with the A.15 work patterns; it cannot fill the component position with the plan, simulation, inspection checklist, or generated prose.
After machining Work occurs, identify the A.3.4 transformation and the applicable work-to-change predicate or admitted local claim. If the Work first makes a new component satisfy its identity rule, cite the separate A.15.PROD inception claim; if a completion criterion is satisfied, cite the separate completion claim. Evaluation, dimensional evidence, and acceptance remain separate. A reliance-bearing PUA closure must additionally name the category-correct basis that makes the component or changed state the result relative to the machining Work or another named relative object; neither the flow position nor result wording supplies it.