Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 07:00:10 UTC

E.17.EFP:5.2.a - Non-entailed link exits the profile

Source claim. D-21: The reserve path remained available during observed overload interval O-7.

Proposed connective. Therefore the reserve-path design is robust against every short overload.

No source premise, effective-scheme rule, or already obtaining robustness relation derives the universal design claim. addedLinkPolicy cannot repair that absence. To retain the sentence, constitute exact target episteme E_robustnessClaim and apply the direct robustness, comparison, bridge, or B.5.2 hypothesis pattern appropriate to the intended claim. Until that relation obtains, remove the sentence or leave EFP; it is not source-linked reconstruction.