Source changed 2026-10-03 16:02:47 UTC · snapshot created 2026-10-03 16:03:51 UTC · last check 2026-10-03 17:15:04 UTC
E.18.1:9 - Consequences
Consequence
Benefit
Cost or mitigation
A compact carry-through note can be materialized when another person or later action needs replay.
A practitioner can recover how the accepted problem-side claim led to the applicable pattern contribution and its result.
Ordinary conversation adds no record; transfer, audit, delayed feedback, costly reversal, automation, or durable reuse pays for the note.
Positive carry-through structure comes before boundary.
First use is readable before the heavier relation aid.
Boundary checks are still available in one canonical section.
Result language becomes unpackable.
Artifacts, telemetry, acceptance, measurement, and refresh can be handled by their own records; unresolved role enactability wording goes through E.10.ROLE and then to the pattern for the recovered object or relation.
More than one application may be needed for one wording span from an admitted source.
P2W stays non-procedural.
The pattern can be used in many project situations without prescribing one local procedure.
A work procedure comes from method material or A.15.2 planning material outside P2W.