EAM.10:10 - Architectural Rationale
The combination is the subject because shared constraints and joint consequences can change which option should be selected at each asset. This differs from both single-asset value comparison and maintenance scheduling. Enumeration is selected for small cases because the assumptions and omitted alternatives remain inspectable.