EAM.7:1 - Problem frame
Use this pattern when a needed service contribution has become a proposal to acquire or modify an asset. A team has a preferred machine, supplier or design, but materially different ways of obtaining the contribution could change cost, risk or feasibility.
Begin by separating the required contribution from the first bearer assumption. Return a small, technically meaningful alternative set, including the realization conditions the next comparison needs.