F.17:12.4a - Manufacturing batch across material and planning contexts

A furnace team uses batch for one physically handled set of shafts that shares a heat-treatment run and traceability basis. A planning dashboard uses batch for a grouping of intended PlanItems. Spelling does not make these one governed value. Recover the physical batch under the material or production DPF pattern that supplies its identity and part-whole rules when the proposed comparison relies on either; recover the planning grouping and its relation to intended PlanItems under A.15.2. When the row gate is met, record separate rows for the distinct governed values. A needed semantic comparison may cite an obtaining F.9 Bridge and a separate affirmative C.2.1 claim stating direction, correspondence rule and tolerated loss with current reliance; those facts do not combine the values into one row. If either selected row edition must be made available, apply E.24.PUB separately. A batch row cannot turn a PlanItem grouping into a physical holon or make the physical batch a WorkPlan.