Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 05:50:20 UTC

F.6:7.1 - Robot Inspection

MaintenanceInspectionAssignment is a declared species under U.SystemRoleAssignment. Its participants include a HolderSystemSlot for the assigned System and a local AssignedSystemRoleKindSlot whose value is an InspectorSystemRole. Its rule applies within the Plant A maintenance scheme and says that the fixed holder is assigned under that kind to supply the inspection contribution; one occurrence is the maximal uninterrupted interval for which that rule stays true for the same participants.

InspectionAssignment-17 : MaintenanceInspectionAssignment
  HolderSystemSlot: Robot-7
  AssignedSystemRoleKindSlot: InspectorSystemRole
  predicateTrueInterval: [2026-07-13T09:00, 2026-07-13T17:00]

InspectionWork-17 was performed under InspectionAssignment-17.

The case basis directly links that Work to that assignment; the matching holder and interval only confirm necessary conditions. Robot-7 is the actor. Separately, the inspection Work enacts TurbineInspection@Maintenance-2026 as its Method. InspectorSystemRole, a sensor capability, algorithm-possession wording, the Method, and TurbineInspectionProcedure-v3 do not perform the inspection. Use A.3.2 to decide whether that last episteme is a MethodDescription. Calibration state, Method adequacy, report quality, and acceptance remain separate.