Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-10-14 19:58:00 UTC · snapshot created 2026-10-14 19:58:38 UTC · last check 2026-10-15 01:55:10 UTC

IS.3:5.1 - Compare complete first-week alternatives

This constructed extension of Harbor Design uses invented quantities to show the comparison. Six analysts are available. After the local diagnosis, suppose four have adequate current capability for the selected case family and two need a supported attempt with feedback. The intended first-week contribution is eight eligible package checks, with the two additional analysts beginning to acquire the missing comparison operation. In the current continuation, the four capable analysts can provide those eight checks at 0.20 hours each, using 1.6 hours already available for checking. The two analysts’ acquisition requires additional work.

All three serious alternatives require the same access repair, taking 1.5 technical hours, and a 0.5-hour managerial contribution that makes the review interval and receiving decision effective. These two hours are counted once in each alternative.

First-week alternativeScarce qualified provider timeOther direct time, including ordinary checkingComplete effort for the selected work
Full six-person workshop, followed by brief individual follow-up2 hours preparation + 2 hours teaching + 6 × 0.25 hours follow-up = 5.5 hours6 × 2 hours attendance + 6 × 0.25 hours follow-up participation + 2 common hours + 1.6 hours checking = 17.1 hours22.6 hours
Targeted workplace rehearsal for the two analysts1 hour preparation + 2 × 0.75 hours coached rehearsal = 2.5 hours2 × 0.75 hours participation + 2 common hours + 1.6 hours checking = 5.1 hours7.6 hours
Qualified expert supplies the checking contribution for eight cases8 × 0.20 hours = 1.6 hours2 common hours; the expert replaces the analysts’ checking contribution3.6 hours

These totals include the eight checks and the implementation work in the constructed alternatives. Other unchanged package work remains outside this comparison. Relative to the 1.6-hour checking continuation, the additional effort is 21, 6 and 2 hours respectively. Shared workshop time is counted separately for the instructor and each participant because they are different people occupying that interval; replaced checking work is not counted twice. No effect size or learning success is assumed from the arithmetic.

Suppose only three qualified support hours are available after existing commitments. The workshop is unavailable in that window. Targeted rehearsal fits the time limit; that inequality alone does not prove a workable schedule, but the two agreed 45-minute intervals and the preparation time provide one.

Expert execution supplies the immediate result at lower first-week effort. It does not supply the intended analysts’ acquired comparison operation. If the recipient requires only the eight immediate checks, that service can be selected. If developing the two analysts is part of the authorized promise, the service is not an equivalent cheaper answer.

The parties select targeted rehearsal for the bounded acquisition attempt and retain the existing qualified review condition until later performance supports another allocation. The actual rehearsal Method and assessment come from HCD and the subject provider. A.3.1.MI examines what happened; the table itself proves neither learning nor the target Method’s effectiveness.