Library / Method Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 05:45:20 UTC

ME.12:4.2 - Record the Result

Result positionRequired content
coherence useBlocked decision, reader, relied-on claim, qualification window, agreement and stop conditions.
subject statusAdmitted Method or candidate account, plus separately identified Work, WorkPlan, description, representation, support, and evidence results in scope.
maintained claimClaim or predicate, owner, edition or occurrence, source or construction basis, intended use, and currentness.
comparison basisConstruction requirement, description claim, selected representation rule, support premise, trial evidence, or declared conformance criterion actually used.
findingAgreement, contradiction, missing information, failed declared conformance, stale source or edition, or missing owner; include the evidence reach.
repair routingOne maintained result to reconsider, smallest correction, unaffected claims and statuses, and downstream uses that must be rechecked.
rerunSame-check result after repair, or the changed use or basis that requires a new check.
returnVerified bounded claim, corrected claim, or named gap; non-use and reopen condition.