Link to current text
ME.12:7 - Conformance Checklist
-
The blocked use and one claim relied on for that use are named.
-
The Method is admitted or the proposed whole remains a candidate account.
-
Construction, MethodDescription, representation, support, Work, and evidence results retain separate identities and statuses.
-
The claim owner, edition or occurrence, intended use, source, and currentness window are recoverable.
-
Trial evidence is qualified, and the claim’s maintained owner remains explicit.
-
Agreement, contradiction, missing information, failed declared conformance, staleness, and missing owner are not merged.
-
Every correction returns to one maintained result and preserves unaffected claims.
-
A repaired claim is rechecked against the same basis, or a changed basis starts a new use.
-
No coherence result is overread as fit, transfer, worth, contribution, causality, capability, admission, or publication.