Library / Method Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 14:36:52 UTC · snapshot created 2026-10-03 14:38:14 UTC · last check 2026-10-03 15:05:10 UTC

ME.21:7 - Conformance Checklist

  • The receiving use and the contribution being allocated are recognizable.
  • Source assertions, recovered candidate accounts, current supply and occurrence evidence retain their different roles.
  • Current supply was compared at the action, result, condition and stop that matter.
  • Every merge or split preserves its semantic reason; unresolved differences remain visible.
  • The destination states the useful change and the direct-source or instructional remainder.
  • Method identity and composition claims have their own basis.
  • A changed premise leads to an identifiable reconsideration or stop.