Library / Method Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 02:22:15 UTC · snapshot created 2026-10-03 03:38:22 UTC · last check 2026-10-03 04:00:05 UTC

ME.3:0.1 - Working Distinctions

Name used hereMeaning
situation familyThe recurring class of receiving Work and conditions for which criteria are intended, with important variation and exclusions explicit.
receiving Work and resultThe dated Work occurrence or intended occurrence and the professional result it must produce or preserve. They are not the Method.
required Method contributionA reusable action, result, or preserved condition needed from one Method or from named Method relations, stated before assigning it to a candidate.
criterion subjectThe actual object or relation constrained by a criterion: Method/account content, MethodDescription, performer capability, covering Work assignment, permission relation, decision-authority relation, performed Work, decision result, support/access, responsibility, cultural relation, or another domain subject.
performer capabilityAn ability needed to enact or judge a contribution. It is distinct from responsibility, access, assignment, permission, and decision authority.
Work assignmentA named assignment occurrence whose holder is one admitted System and whose scope and window cover specified Work. The assignment alone establishes neither permission, decision authority, performed Work, nor a decision result.
permission relationAn independently supported relation permitting a named System to perform a specified act within a stated subject, scope, window, and basis. It does not create an assignment, prove performance, or confer decision authority beyond that exact permission.
decision-authority relationAn independently supported direct relation under which a named System may issue a named decision result. Its subject, decision scope, window, basis, and evidence for reliance are explicit; assignment, performed Work, capability, responsibility, access, and acceptance need separate evidence.
allowable variationA range or branch that may change while the receiving result and non-negotiable conditions remain protected.
burden limitA bound on time, attention, capacity, delay, coordination, cost, or another named burden at its actual participant, scope, and window.
evidence needThe observation or record required before a later decision may rely on criterion satisfaction. It is not satisfaction by itself.
acceptance or stop observationThe observable condition under which the criterion can be passed to a later decision or must stop that route. It does not accept a Method or product by itself.