Library / Method Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 10:39:28 UTC · snapshot created 2026-10-03 10:40:04 UTC · last check 2026-10-03 11:45:17 UTC

ME.3:9 - Consequences

The project obtains criteria that say what must hold and where, rather than a generic context score. Missing capability can trigger preparation, an access failure can trigger support redesign, a product stop can withhold release, and an architecture burden can remain open without blaming an individual Method.

The cost is more explicit subject placement and fewer easy rankings. Some criteria remain unknown until evidence or a candidate account is available, and a complete criteria set still makes no selection.