9.4.1 Preparation now, reopening after performed trials
Invoke ME.9 only for Method representation profile MRP-EC417-B2-Review-1, because two unlike actions must be related without becoming one view. Both return to candidate C-EC-Release-v2 and current candidate-account episteme ECA-EC417-C-Release-v2-1.
Preparation now. C.37 claim group C37-EC417-B2-Prepare-1 has receiver SafetyReviewer-17 and exact action ‘check the supplier-prepared signed-versus-provisional pinout comparison and identify the affected safety checks before release’, using the instruction in section 7; direct subject result ERP-EC417-WP-B2-1 is a C.2.1 episteme about proposed allocation and order, evidence entry, confidentiality, recovery, and stops while preserving WorkPlan status. A.2.4 classifies that preparation use, and A.10 path P-APP-EC417-Prepare-1 returns pass in its current-edition window. ME.6 decision AD-EC417-B2-Trial-1 governs the trial alternative: its predicate compares A, B, and B2 against the receiving, capacity, confidentiality, assignment, permission, authority, evidence, and reversibility conditions; its actual outcome selects no more than three prospective B2 trials under those conditions. That trial choice does not supply a directly governed result admitting this representation’s contribution to the preparation action. The preparation claim group is unresolved until the preparation-use owner returns its governing predicate and actual admitting or declining result. The trial decision grants neither performed Work nor any assignment, permission, or authority.
Reopening after performed trials. C.37 claim group C37-EC417-B2-Reopen-1 has receiver MethodEngineer-17 and exact later action ‘decide which findings from performed trial Work reopen the candidate’. In this application the three-release statement remains WorkPlan WP-EC417-B2-Trial-1: no corresponding release Work has yet been admitted, no exact candidate-episteme/viewpoint-edition pair has been tested under E.17.0, and no direct receiving governor has returned a predicate and outcome for that reopen action. A.2.4 classification or an A.10 path cannot replace those missing results, so this claim group is unresolved.
The relation between the uses. The cross-use profile records the shared evidence-entry, confidentiality, recovery, and stop correspondences, the preparation claim group’s missing receiving result, and the reopening claim group’s separate missing Work, conformance, and receiving bases; it keeps WorkPlan, any later Work, both actions, candidate readings, conformance judgments, and receiving results separate. It creates no super-view, Method admission, fit, transfer, worth, publication, or mathematical graph.