MMP.Preface:3.4 - Turn uncertainty into a question about available action
MMP.8 separates circumstances from choices and specifies when information arrives. It then formulates whether the work needs a fixed decision or an instruction depending on an available report, and whether performance is required for each admitted circumstance or on average under a stated probability law.
This formulation can expose a change needed in the work itself: observe earlier, distinguish another circumstance, permit another action or revise the requirement. Method Engineering (ME) develops the observing and acting methods and their composition. Their timing and resource demands return as premises of the mathematical question.
An information-dependent instruction needs both an obtainable report and a participant able to act on it at the stated time. Check this condition for the combined method. A correct reporting law and a correct decision calculation can still describe an instruction that the proposed work cannot perform.
MMP.16 constructs the records that alternatives would produce under feasible designs. Compare the distinction an observation could resolve with its contribution to the receiving question and its burden. An informative report can still leave the preferred action unchanged.
MMP.8.SD develops continuing choice: retain a state or belief sufficient for the proposed decisions, construct transitions and observations, and derive how a present choice and its continuation determine the accumulated consequence. This joins observation design to action when timing, information or changes caused by observing matter.