Library / Maintenance Engineering and Management Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 06:15:20 UTC

MNT.7:12 - Relations

MNT.5 supplies readiness and MNT.6 the selected intervention. OPS.10 supplies qualified capacity where used. MNT.8–MNT.11 govern the actual protection, work, functioning and hand-back returns whose time this Method includes. MNT.15 handles simultaneous shared demands. A changed service concept returns to operation or engineering rather than being inferred from this maintenance plan.