NSTD.Reference:13 - DPF relations
Use the table to connect the methods for the question at hand and to find which contributions may need reconsideration. A citation locates the relevant definition or instruction. For the representation of a dependency, see E.4.PFR.
| Relation used in this DPF | Consequence for the reader | Return or refresh condition |
|---|---|---|
| NSTD uses FPF’s definitions of narrative construction, source use, evaluation, agency and publication. | Interpret the domain methods through the specific cited content. Dependency runs from NSTD to FPF; compatibility across a changed FPF edition needs its own assessment. | Revisit only the dependent use when relevant defining content changes. E.4.PFR defines dependency; E.5.3 constrains its direction. |
NSTD.1–NSTD.8 draw on A.6.3.NAR. | Use the available source selection, ordering or comparison where it answers the narrative question. | Consult NAR when the identity of the source or receiving account, the construction, or their correspondence affects what can be claimed. |
| NSTD.1, NSTD.6–NSTD.8 use EXD.Reference:3 and EXD.6:4.1 when a narrative must explain a subject. | Obtain the connections and grounds the original task requires. Trace what the finished narrative makes available where the recipient must explain or choose. | Where an expert supplied a missing premise, establish whether the audience can use it there. Repair the subject account, access or presentation according to the finding. |
| NSTD.9 constructs and compares narrative interpretations. | Its account supplies units, connections and unresolved readings for selection, presentation or further inquiry. F.0.1 helps when a source expression’s meaning is unsettled; F.0.2 when the question requires synthesis across source ontologies. | Revisit the affected reading when material, a consequential assumption or the question changes. An already described construction can use B.5.RC directly. |
| NSTD.10 constructs fictional or hypothetical events under stated premises. | Its result can be a story possibility or a conditional scenario. A choice about presentation may reveal a need to revise that construction. | Revisit events affected by changed prerequisites or aims. Use an adequate subject result for a real project arrangement. When the connected architecture still needs developing, consult C.32.P2S. |
NSTD.1, NSTD.2, NSTD.6, NSTD.8 and NSTD.10 use A.22.CGUS when branches or constraints need an explicit account. | A narrative can follow one route while retaining alternatives, returns, exits and stopping conditions in the wider structure. | Return to CGUS, E.18.3 or the local definition when the chosen route hides a relation needed to explain the events or decide what could happen next. |
The Source Use And Refresh Map supplies domain source contributions under G.2. | Use each source for the claim and tradition it supports; a citation alone does not establish evidence or authority. | Reopen a missing, stale, contradicted or overextended source claim and compare serious alternatives. |
| NSTD.6 evaluates a narrative version produced or revised through the other methods. | Compare the candidate or accepted account for the intended reader and use; distinguish product quality, source fidelity and production history. | Use A.19.ECS for the characteristic space, C.16 for measurement, and C.2.8 for qualified structural recovery. Revisit changed selection, use, scale or evidence. |
| NSTD.6 results can guide repeated improvement. | Use E.22 when the aim is unclear. Use E.23 to choose a worthwhile change, protect the other qualities that matter and compare the resulting version. | Reconsider the comparison when the intended change, cost, risk or evidence changes or an essential condition is unknown. Use G.11 for a question about currentness. |
| NSTD.7 addresses planning and inspection of generated narratives. | Use an adequate assessment of the version for the intended use, or inspect the outstanding issue. Apply C.35 if the generated result will enter architecture work. | Revisit affected claims when the source, generator, constraints or proposed use changes. Check source fidelity against the relevant material. |
| A seminar, handout or other teaching publication can use NSTD.8. | The material can present a learning route and examples. E.17 concerns the source-backed publication and E.24.PUB its availability to the audience. | Revisit affected tasks, access or sources when the publication, its audience or its basis changes. Evidence about actual teaching or learning comes from its use. |
| NSTD.8 and NSTD.6 support evaluation of learner reconstruction and use. | Distinguish a design walkthrough, an actual reading and a learning-effect claim. Feed an established defect into the relevant repair or E.23. | Revisit changed reader preparation, assistance, source selection or evidence; an evaluation does not by itself grant publication permission. |
| NSTD.4 supplies a voice treatment to NSTD.5’s device choice and NSTD.7’s automated realization. | Carry the speaking relationship, relevant examples or chosen trial, needed content and warranted speaker position into a connected draft. | Compare the actual expression with that basis and its neighbors; reopen the affected choice when voice, meaning or use fails, keeping their conclusions distinct. |
| NSTD.4/.5 can expose agency, responsibility, persuasion or affected-party questions. | Use A.2, A.13, D.1–D.5, A.10 or B.3 for the corresponding claim when it is made. | Reopen the particular claim when wording changes who acts, who is affected, what is supported or who may decide. |