Library / Organization Change Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 12:55:10 UTC

OCE.4:0.1 - Working Distinctions

Name used hereMeaning
specialization boundaryA selected boundary between domains of organization contribution or Work for the current design use. Decide separately which organization units, positions, assignments, and authority relations are needed at that boundary.
contribution-relation specificationPossible-future design content naming an intended direct relation kind or predicate, supplier and receiver, result or preserved condition, applicability, acceptance or use condition, exception return, scope, horizon, and evidence need. The specified relation remains proposed until its obtaining conditions are met.
contribution relation occurrenceOne obtaining occurrence of the admitted direct relation named by a specification or current account. Its predicate, participants, applicability, interval, and evidence must be recoverable independently of the design.
contribution structureAn actual A.22 structure selecting obtaining contribution relation occurrences and their participants for one declared use. Describe a candidate contribution structure as possible-future content until the selected occurrences obtain. Information-use, decision, access, service, coordination, legal-entity, and Work structures can remain separate.
contribution architectureThe way selected structures organize the named organization for its intended contribution, qualified under C.30. Actual architecture requires the applicable subject relations and architecture relation to obtain; candidate or desired architecture remains claim or description content.
position-design needA need to decide whether one or more expected contributions warrant a stable organization position. OCE.5 makes that decision and, when warranted, defines the position.
acceptance conditionThe condition under which a receiver can use or accept the supplied result for the named decision. State the condition in the specification or claim, then use the applicable predicate and evidence to test whether it is met.
exception and escalation relationAn obtaining direct relation for returning an unusable result, resolving a conflict, or issuing a decision when ordinary contribution cannot continue. Specify that relation explicitly when designing a possible future.
contribution-architecture decisionA decision selecting possible-future organization structures, relation specifications, constraints, and open refinements for later change Work. It does not make those structures or relations actual.