OCE.9:4.7 - When stronger assurance is needed
For a consequential capability reliance, use A.2.2 and A.10 to qualify the capability and evidence rather than extrapolating from the demonstration. If the account asserts precise dated Work or a change attributed to the intervention, independently establish the performer through A.13 and the Work/change claim through A.15.1 and A.3.4; add assignment-bound attribution only when it is used. When Method enactment is claimed, identify the Method enacted in the actual Work.
A claim that this intervention caused the improvement requires the relevant causal-use qualification through C.28. Ordinary observation can support a narrower continuation or repair without making that causal claim.