Library / Organization Change Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 02:22:15 UTC · snapshot created 2026-10-03 03:38:22 UTC · last check 2026-10-03 03:50:10 UTC

OCE.9:7 - Conformance Checklist

  • The slice reaches a named contribution and receiving use, including an exception return.
  • The participants can distinguish selected design, effective conditions, performed attempt and capability conclusion.
  • Missing assignment, access, authority, learning, service or protection results stop their dependent action.
  • When adequate separate actions fail to form the intended contribution, the needed constituent/encompassing connection and the supported repair are explained.
  • Failed attempts, repairs, assistance and later-use conditions remain visible.
  • The conclusion states its configuration, work family, window, support and limits; stronger reliance has its own evidence.
  • The receiving operation has an explicit hand-back or a named remaining gap.