Library / Problem Structuring and Decision Support Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 02:22:15 UTC · snapshot created 2026-10-03 03:38:22 UTC · last check 2026-10-03 03:38:16 UTC

PSD.1:4.4 - Choose a provisional boundary and the next truthful branch

Record what is inside the engagement now, what remains outside, and what observation would move that boundary. Do not treat package order or the numbering of patterns as a practitioner sequence. Choose the next branch from the missing result:

Current situationNext truthful branch
participants, concerns, consequences, or representation are incompleterecover the participation and concern account through PSD.2
materially different formulations or intervention logics remain hiddengenerate plural problem formulations through PSD.3
the engagement has no usable included/excluded scope and reopen basisset and reopen the problem boundary through PSD.4
the engagement is bounded but needs a model, a choice or combination of problem-structuring Methods, or facilitationuse PSD.5 for the model, PSD.6 for Method selection or combination, or PSD.7 for facilitated inquiry
the engagement is bounded and the live gap is alternatives, uncertainty, comparison, or recommendationbegin with the first missing result in PSD.8–PSD.13
another practice owns a premise that can reverse the returninspect or request the smallest bounded result through A.15.9
an authorized chooser already has an adequate option set and comparison basisuse C.11 or the direct domain choice rule; stop treating engagement framing as the live question

Several branches may be live together. Their results can proceed concurrently when their subjects and returns are clear. Co-occurrence does not turn the table into a workflow or make the engagement one Method.