PSDA.20:8 - Common Anti-Patterns and How to Avoid Them

MisuseWhy it fails and what to do instead
Start by drawing every actor and goal.A large picture can still miss the consequential question. Begin with the receiving use and add a relationship when it can change the answer.
Count favorable arrows or satisfied goals.Counts hide the meaning and strength of the grounds, necessary combinations and protected conditions. Use the qualified consequence analysis and explain the returned profile.
Treat a supplier name as delivered work.A named provider may lack access, time, competence or an accepted assignment. Use evidence of delivery to claim that work was supplied. To assess a proposal, establish its needed conditions or state the gap.
Interpret an assumption as a result.“If installed” cannot establish an installation date. Retain the assumption with the conditional answer and return the missing investment or operating premise.
Repair a failed model by weakening the recipient’s criterion.This changes the problem without the required decision. Compare another means or make the proposed requirement change explicit.
Rebuild everything after one change.Independent results can remain valid. Follow the changed relation and its downstream reliance, reopening the boundary only when the new question requires it.