PSDA.6:5.7 - Separate an uncertain result from its value
A team compares two ways to obtain optional machine time in a ten-hour window. Existing provision covers required service; this comparison concerns additional usable hours, with other material consequences held equal. S supplies four hours for certain. R supplies ten hours if a trial succeeds and zero otherwise. The team prefers more usable hours, but that ordering does not yet compare S with R.
For a success probability of one half, utility u(x) = x/10 gives EU(S) = 0.4 and EU(R) = 0.5; R is preferred. Utility u(x) = sqrt(x/10) preserves the same ordering of certain hours but gives EU(S) = sqrt(0.4), approximately 0.632, and EU(R) = 0.5; S is preferred. These two constructed functions show why the certain-outcome ordering is insufficient. Neither is an elicited preference.
The team accepts the expected-utility form for this bounded comparison and uses zero and ten hours as its reference consequences. Let q = u(4), with u(0) = 0 and u(10) = 1. Asked about hypothetical chances, the team says that four certain hours are no worse than a 40 percent chance of ten hours, but a 70 percent chance of ten hours is no worse than four certain hours. Each lottery otherwise gives zero hours. These answers yield 0.4 <= q <= 0.7; they supply no point estimate.
Separately, engineering evidence bounds R’s success probability by 0.45 <= p <= 0.55. In this constructed case the probability estimate and preference restrictions impose no additional joint constraint. Thus EU(R) - EU(S) = p - q ranges from -0.25 to 0.15. Neither alternative is necessarily no worse. The accounts (p,q) = (0.55,0.4) and (0.45,0.7) witness opposite preferences. The two accounts leave the ranking open. Greater precision about success can still leave the team’s valuation unresolved.
The team can answer one further preference question: four certain hours are no worse than a 60 percent chance of ten hours, otherwise zero. Intersecting that answer with the previous family gives 0.6 <= q <= 0.7. The difference now ranges from -0.25 to -0.05, so S is strictly preferred throughout the joint family. No midpoint utility or invented probability over utility functions was needed.
A changed engineering result can reverse that conclusion without changing the preference account. If a genuinely different trial design raises the supported success range to 0.8 <= p <= 0.9, while the consequence meanings and other consequences stay the same, the difference ranges from 0.1 to 0.3: R is now strictly preferred. If the redesign also changes cost, timing or the meaning of usable hours, those omitted consequences must first enter the profiles; the old one-attribute calculation would no longer answer the whole comparison.
The construction concerns one attributed preference account. It neither aggregates conflicting team members’ views nor establishes that the trial has the assumed success probability. Those are separate inputs whose absence would leave a different question open.