STR.16:5.4 - A changed condition makes branch provision preferable
Before starting, a qualified new operating commitment reduces available methodologist time from 64 to 52 hours. Its timing leaves enough room for B’s checked schedule. No other premise changes.
A now needs 54 and no longer fits. B needs 50 and remains feasible. The owners compare three serious responses: defer two hours of a result whose later need genuinely permits it, obtain qualified outside support, or select B. They cannot simply cut two arbitrary hours from the common method’s necessary construction and continue to promise A.
Suppose no timely qualified substitute is available and the owners prefer to preserve the two independent inquiries, current delivery and both bounded product constructions. They select B and its 1,800-unit payment. The reusable common maintenance result is deferred; the already specified source returns and exchange keep later combination possible at its actual modest cost. The research was not sacrificed merely because it lacks near-term revenue.
Only the changed support arrangement and its receiving applications need reconstruction. The research questions, current product methods and separate client authority remain intact. If one inquiry later produces a result useful to both products, that creates a new support candidate to examine; it does not retrospectively turn the original research into a required product stage.
If the new operating commitment were not yet authorized, the current 64-hour arrangement would remain the decision basis. If it consumed a researcher rather than a methodologist, switching A to B would not repair that different resource conflict.