Source changed 2026-10-03 02:22:15 UTC · snapshot created 2026-10-03 03:38:22 UTC · last check 2026-10-03 05:00:10 UTC
SYSE.11:12 - Relations
A compatible SYSE.3 result supplies only the realization arrangement needed by this increment. Every relied-
on unsupported branch must be closed, replaced by a qualified result, or retained as a blocker before Work
uses it.
A compatible SYSE.12 result supplies pre-use platform capability and condition claims. Later participation or
provision Work produces later evidence and cannot justify the earlier input retroactively.
A compatible SYSE.18 result supplies an obtaining coordination relation and its commitments and limits. It
supplies no constituent output or borrowed authority. SYSE.13 supplies configuration and effectivity claims
for the same Systems and use.
A.15.1, A.2.1, and A.3.1 distinguish Work, assignment, and enacted Method. A.3.4 distinguishes actual
transformations, and A.15.PROD governs claimed result production.
C.11.CRC constructs a finite contribution comparison when a proposed change’s contribution relative to the
current configuration is not already explicit. C.11 governs the next choice. Neither result is the later Work
or transformation.
A bounded usability assessment can inform SYSE.4 only within its supported use and evidence window. SYSE.14
retains release and evidence-continuity authority.
Operations, Maintenance, Platform Engineering, safety, security, law, governance, finance, and other specialist
practices retain their Methods and decisions.