SYSE.14:4.1 - Perform the Move
- Bound the release question. State the identified description, software package, or actual System under consideration; its relevant configuration; the named next Work or use; the deciding Agent; the interval and conditions; and the current options. The option set may include release, narrower release, trial, withholding, rejection, or obtaining another result first.
- Establish the configuration and effectivity. Use a compatible
SYSE.13result or qualified direct sources for the units, descriptions, installed realizations, sites, intervals, and conditions that matter. Return a missing configuration result instead of guessing correspondence. - Separate the trigger from the candidate. Record the triggering event—for example, a request, criticism, incident, opportunity, or source change—with its evidence status. Describe viable change candidates separately. Keep the unchanged-System option when viable; treat deferral as a decision to await an event or obtain another result.
- Trace consequences far enough to change the choice. Identify affected actual Systems and relations, descriptions, realization and integration Work, provider and receiving Agents, obligations, supporting evidence, and reversibility. Use files, team names, and hyperlinks to locate relevant records or Agents, then establish the affected world-side objects and relations.
- Name the Agents and governing relations. Identify the Agent making the release decision, Agents granting required permissions, Agents performing later Work, and receiving Agents. State assignments, authority, permissions, conflicts of interest, and abstention conditions separately.
- Qualify the evidence. Connect each evidence result—for example, a test result, model evaluation, trial
observation, specialist result, or assurance result—to the claims, configurations, conditions, and uses it
supports. When a relied-on source changed, use a compatible
SYSE.19result or reopen the affected claim directly. - Compare the current options. Hold the option set and comparison basis stable long enough to choose. State
protected characteristics, acceptable losses and material uncertainty. Use
C.11for the choice itself. When further evidence is being considered because it could change this choice or its warranted use, compare the feasible next observation’s cost and decision value. Retain the resulting inquiry judgement or limitation needed by this decision or its recipient. Inactive inquiry requires no observation proposal or record. - State and return the release decision. Name the selected disposition, subject, effectivity, conditions, evidence, authority, permissions, unresolved risks, permitted next Work, withheld scope, and reopen conditions. If a decision-changing input is missing, return that missing result rather than approved with caveats.
- Connect later realization. When implementation or integration has occurred, identify the performing Agent, dated Work, Method, actual transformation, resulting configuration, and observations. Update affected descriptions and recipients, but do not use a record update as proof of realization.
This is an A.22.CGUS learning unfolding, not a universal Work sequence. A release for realization can occur
before implementation; release to service can depend on later implementation and observation; emergency
containment Work can precede a full technical choice under its own authority. The case must state its actual
dependencies and timing.