Source changed 2026-10-03 08:25:59 UTC · snapshot created 2026-10-03 08:26:43 UTC · last check 2026-10-03 08:30:15 UTC
SYSE.15:7 - Conformance Checklist
The System to be created or changed, recurring engineering result, receiving decision, conditions, and
protected losses are stated.
Every Method remains distinct from descriptions, tools, Work, performing Agents, assignments, capabilities,
evidence, provider arrangements, and cultural relations.
Each Method has a reusable action, participant meanings, applicability, intended result, and limits.
A narrower engineering Method is retained only when its specialization changes useful and warranted action
at comparable effort.
Classification, whole–part participation, alternatives, replacement, result use, compatibility, and Work
timing are stated separately.
Interacting Methods are exercised in representative engineering Work, and limiting System, integration,
assurance, cost, time, capability, and platform consequences are observed.
Missing capability, assignment, provider, platform, permission, evidence, or authority is returned to its
own decision rather than hidden as a Method defect.
Project evidence and expert estimates remain distinct from visibility, declared conformance, and cultural
prevalence.
The account names retained, replaced, excluded, proposed, and unresolved Methods with material reopen
conditions.