Source changed 2026-10-03 08:01:07 UTC · snapshot created 2026-10-03 08:04:31 UTC · last check 2026-10-03 08:25:20 UTC
SYSE.18:7 - Conformance Checklist
One shared use, conditions, interval, affected Systems, current decision, and deciding Agent are stated.
Every constituent is an actual System included because its participation, output, failure, change, or
withdrawal can alter the use.
Each relied-on relation has its own predicate and participants; no umbrella contribution relation replaces it.
Independence is stated for named decisions and relations, not as an absolute property.
Every deciding Agent, assignment when relevant, authority, permission, conflict, and escalation is stated.
Interface syntax is supplemented by configuration-bound exchange and use evidence where interoperability is
claimed.
The selected alternative remains within the deciding Agent’s authority and names outside decisions and
unsupported dependencies.
Any claimed coordination change identifies performing Agent, Method, dated Work, actual change or relation,
configuration, representative observation, and evidence limits.
The decision episteme, performed Work, world-side change, and observed-coordination claim are identified and
grounded separately.