Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 06:45:03 UTC
SYSE.19:7 - Conformance Checklist
The predecessor and later or replacement source epistemes are identified.
Edition continuity is established under C.2.1 or left unresolved.
Material claim changes are separated from publication and carrier changes.
Every affected use names the source claim, receiving decision or Work result, and direct-reliance relation.
A searched frame distinguishes dependent, irrelevant and unresolved uses; equivalent irrelevant mentions can
be grouped. Actual-use support and coverage justify any no-impact claim. Tracing stops at action-changing closure.
Any selected revalidation Work warrants its complete burden for this receiving use and names its Agent,
Method, configuration, conditions, evidence needs, authority, result and stop.
The decision episteme, performed Work, evidence, permission, assurance, and release decision are grounded
separately.
Historical source editions and decisions remain recoverable for their original uses and intervals.
The receiver gets the sufficient branch result and its material limits. A harmless reference repair or direct
engineering answer closes without a duplicate record; next Work is included only when selected.