SYSE.19:7 - Conformance Checklist

  • The predecessor and later or replacement source epistemes are identified.
  • Edition continuity is established under C.2.1 or left unresolved.
  • Material claim changes are separated from publication and carrier changes.
  • Every affected use names the source claim, receiving decision or Work result, and direct-reliance relation.
  • A searched frame distinguishes dependent, irrelevant and unresolved uses; equivalent irrelevant mentions can be grouped. Actual-use support and coverage justify any no-impact claim. Tracing stops at action-changing closure.
  • Any selected revalidation Work warrants its complete burden for this receiving use and names its Agent, Method, configuration, conditions, evidence needs, authority, result and stop.
  • The decision episteme, performed Work, evidence, permission, assurance, and release decision are grounded separately.
  • Historical source editions and decisions remain recoverable for their original uses and intervals.
  • The receiver gets the sufficient branch result and its material limits. A harmless reference repair or direct engineering answer closes without a duplicate record; next Work is included only when selected.