SYSE.20:10 - Rationale
Method organization, dated Work order, and simultaneous Work answer different questions. A Method unfolding says how a reusable way of doing is organized. A temporal relation says when admitted Work occurs. Work parthood says which occurrence contributes constitutively to another Work whole. Treating them as interchangeable destroys either useful overlap or necessary order.
Engineering adds a recurring domain difficulty to the general C.32.MWA problem: several contributions must
produce a result about one configured engineered System while using models, evidence, specialist decisions, and
enabling Systems with their own identities. Connecting the recovered structures to that result makes a bounded
reconfiguration decision more useful than choosing a universal lifecycle or accumulating a large architecture
dossier.