SYSE.2:5.3 - Occupied building heat-pump control
For HeatPumpPlant-HP1, ControllerConfig-C2, the next heating season, and ArchitectureDecision-AD1, the three
compatible input accounts use the same subject, configuration, use, horizon, evidence window, and receiving
decision:
- the
SYSE.16use-context account states theBuildingHeatingSystem-BH1proper-part claim, energy and information transfers, plant-room access permission, and unsupported latency, override, insulation, and clearance assumptions; - the
SYSE.17affected-system account supplies the qualifiedAcousticResult-AR4,SafetyResult-SR7,ThermalResult-TR5, and their authority boundaries, including the unmeasured neighbour-noise and cabinet- clearance branches; and - the
SYSE.8provider-arrangement account supplies only the supported provider claims and design constraints: actual provider SystemMaintenanceTeam-MT4, the current access permission, expected diagnostic Work, the communications bearer, and the missing commitment and authority result for remote monitoring.
The three accounts change the linked proposal as follows:
use claim: occupied rooms remain within the selected thermal range while qualified neighbour-noise and maintenance-access constraints hold
system-concept claim: ControllerConfig-C2 includes a cycle-rate limit, a low-noise branch, a measurable cabinet-location alternative, and a latency-tested override-safe branch
main uncertainty: night acoustic measurement and plant-room clearance are unavailable; remote-monitoring authority and commitment are unresolved
architecture question: which controller, sensor, cabinet, communications, and operating structures support those qualified claims
reopen condition: a specialist result, measurement, provider result, or operating observation defeats one of the linked claims
The remote-monitoring branch remains conditional because the provider-authority and commitment result is
unavailable. Realization and WorkPlan descriptions may include cabinet relocation, access preparation, and test
Work. Keep those realization and WorkPlan descriptions distinct from the System concept. If no feasible architecture supports the linked claims, revise this proposal. Reopen SYSE.1 only if the
failure changes the project focus itself.