Library / Systems Engineering Principles Framework
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 10:39:28 UTC · snapshot created 2026-10-03 10:40:04 UTC · last check 2026-10-03 11:10:20 UTC

SYSE.3:7 - Conformance Checklist

IDRequirement
CC-SYSE3-1A conforming use SHALL start from one named C.30/C.32 architecture candidate or decision and SHALL state the selected structures and use for which realization feasibility matters.
CC-SYSE3-2If required functioning has no candidate bearer, the practitioner SHALL reopen the bearer question under A.6.F and C.32 rather than treating the missing architecture answer as realization Work.
CC-SYSE3-3The first result SHALL name one unsupported realization branch, the proposed transformer System or unresolved need for one, the missing enabling condition, one next WorkPlan item, and the earlier answer to reopen if it fails.
CC-SYSE3-4Intended change SHALL remain modal; an actual transformation claim SHALL satisfy A.3.4, and a not-yet-existing System SHALL use production and identity-inception claims rather than a fictional prior transformation.
CC-SYSE3-5A proposed transformer-role assignment and capability SHALL remain plan or candidate content until A.2.1 and A.2.2 supply their direct results.
CC-SYSE3-6The realization description and A.15.2 WorkPlan SHALL remain different epistemes; neither SHALL be treated as performed Work, actual change, production, or an actual selected network.
CC-SYSE3-7Recursion SHALL be added only when realizing a transformer System, capability, Method, tool, resource, or platform contribution changes the next action.
CC-SYSE3-8E.18 and E.18.NET SHALL be used only after their member, relation, constraint, endpoint-binding, and use-frame conditions are met; otherwise the result SHALL remain a Plain provisional realization-network description.
CC-SYSE3-9Platform, organization, operations, portfolio, configuration, integration, authority, and assurance questions SHALL retain their specialist Methods and supply named results to this branch.
CC-SYSE3-10A branch failure SHALL reopen only the smallest architecture, concept, use, or project-focus claim it can change; a local failure SHALL not reopen every earlier answer.
CC-SYSE3-11DesignRunTag and flow valuation SHALL remain local to their leaf bindings; the result SHALL establish no global stage or lifecycle order.