SYSE.44:5.1 - Compare divisions for the same service-update proposal
The receiving result is a bounded service-update proposal with an applicable interruption/recovery contract and a capacity/backlog calculation. Target, source edition, demand interval, interruption duration, worker effects and allowed backlog must agree. The following are constructed comparison conditions, not measured agent timings.
One available LLM context can do both jobs. A two-context alternative gives the long contract examination to one context and the capacity calculation to another. Here the numerical input is already settled, the common brief is short, both contexts can obtain their needed source, and the integration check is a small comparison of duration, capacity and limit. A stipulated representative trial for this configuration shows that the one-context way repeatedly loses a needed contract qualification when moving between the long source and calculation; separate working material avoids that repetition without adding an equally costly join. The preference is adequate result with least total preparation, execution and repair burden.
Compare three complete ways. One-context completion retains the repeated rereading/checking cost but needs no handover. The proposed division adds the short common brief and join, while keeping each examination usable. A third proposed division omits the settled duration from the calculation brief and makes it a later return from the contract reader. That arrangement creates a serial dependency: the calculation must wait or stay conditional, so its apparent parallel gain is unavailable. C.38 constructs these ways and C.11 selects the second under the stated evidence and preference. No number of contexts by itself supplies the choice.
The contract reader returns the allowed recovery operation, duration, worker effects and source edition. The calculator consumes the settled inputs and returns the backlog trajectory with units and assumptions. Integration compares the modeled interruption with the contract and uses the joined proposal in the engineering decision. A fluent summary that omits the duration would fail this join.
Now supply a short authoritative contract excerpt and a calculation that the same one context can keep and check reliably. The repeated-rereading cost disappears while the extra brief and join remain. Reopen the same-result comparison and keep the work together. If instead duration was genuinely unsettled, obtain it first; useful source examination may continue while the capacity result stays conditional.
During a divided attempt, a new contract edition doubles the interruption duration. Reopen the dependent trajectory and the proposal that consumed it. An unrelated description of the monitoring interface remains usable. If both contexts copied an incorrect capacity from one summary, their agreement adds no independent evidence: obtain the actual capacity basis and retain the calculations as conditional if it is unavailable.