Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-23 00:01:58 UTC · snapshot created 2026-11-23 00:02:28 UTC · last check 2026-11-23 06:15:10 UTC

SYSE.54:4 - Solution

Choose the extent of modelling from the receiving question. For broad discovery, reconcile the event account enough to locate consequential disagreements and select a useful inquiry. For a selected process, develop the connecting causes and decisions, then challenge the flow with a variation that could change the design. Add software structures only when they answer a current implementation question. The following operations can repeat as the account changes; the selected depth determines which are needed now.

SYSE.54:4.1 - Choose the purpose and prepare participation

Choose among three EventStorming purposes. Big Picture locates important disagreements across a domain or business line. Process Modelling explains a selected behaviour, its alternatives and the decisions responsible for them. Software Design asks how state, consistency and interface boundaries can support that behaviour. These choices concern different questions. Within any of them, choose which events, parts of the work and timing or state distinctions the answer needs. A single transition can matter to a domain-wide decision. A common rule can settle a local software question.

State the practical question and initial scope, the current or proposed situation, and the decision or learning that would make the session useful. Invite the people who know the consequential perspectives, including those handling exceptions or receiving the result. A representative cannot fill an unknown fact by agreement. Record the missing perspective and obtain it before relying on the affected claim. Arrange a shared surface that everyone can read and change. Physical notes and an accessible digital board are alternatives. Check that remote participants can add and correct the account themselves.

Use a simple visible legend. Introduce events first; add another notation only when the discussion needs its distinction. Labels as well as colour carry meaning. Agree how disagreements will be marked and revisited. Start with the terms the discussion needs. The facilitator keeps the question in view and helps everyone participate, including those who disagree. Domain participants describe and challenge the behaviour. If a design decision follows, identify who makes it and under what authority.

SYSE.54:4.2 - Recover events and reconcile the stories

Collect significant domain events in past-tense language, such as “kit collected” or “inspection failed”. Participants can initially contribute in parallel when an official story may be incomplete. For each ambiguous note, ask which occurrence it means and who would notice a consequential difference. “Process booking” names an activity; “booking recorded” names an occurrence; “booking is active” names a state that can persist. Preserve separate interpretations until examples show whether they are the same.

Arrange events in a plausible temporal account. Use separate lanes for cases or simultaneous threads when needed. Before grouping events as one completion, ask whether two histories bearing that label call for different action or explain the outcome differently. Open the group only as far as the distinction requires, and connect the constituent occurrence back to the completion it could affect. Events in different services may supply one another without belonging to the same work. Mark a hot spot at the affected behaviour for a disputed rule, risk or missing link.

Walk through the account aloud with a narrator and participants who can correct it. Ask where a thread starts, what interrupts it, what counts as a useful or failed ending, and what happens beyond the initial scope. Follow a troublesome result backwards to its required conditions, then forwards again. Add the surrounding event or participant when the initial boundary hid a cause or consequence. Agreement after this walkthrough establishes a jointly corrected account. For a claim about what happens in practice, use observations that support that claim.

SYSE.54:4.3 - Explain decisions and changing state

For a selected flow, identify who uses which information to request an action, to whom they send the request, and who is responsible for responding. The request can be accepted, rejected or remain unresolved. An event note states the claimed outcome. Establish the occurrence separately when the receiving claim requires evidence. A subsequent decision may initiate another action under a rule. Ask who makes that decision, with what information, under which condition, and when. Human judgement and automatic rules can both occur; a drawn rule does not supply authority to act.

ElementQuestion that makes it usefulDistinction to preserve
Domain eventWhat consequential occurrence has happened in this account? To which case or object?Distinguish the report from the occurrence and qualify the occurrence claim. A future scenario can propose the occurrence.
Command or action requestWho asks whom to do what, and what permits or prevents acceptance?Requesting a booking is not successful booking. A command is not the reusable Method of carrying out the work.
Decision rule or policyOn this event, under these conditions, what should be done next and by whom?“Whenever” needs its exceptions and timing. Temporal order alone establishes neither a decision rule nor a causal connection.
Information used for a decision, often called a read modelWhat information must be available to whoever makes the decision, where does it come from, and can it be stale?A display of availability may differ from the state used to accept a reservation.
State-bearing domain object or systemWhat changes, which identity continues, and what must remain true?The event “hold expired” differs from the interval during which a hold is active.
External participant or time conditionWhat can happen without this team’s command, and how is it noticed?For a supplier refusal, identify how notice reaches the responsible participant and how they respond. For a deadline, identify how expiry is detected and acted on.

Connect an event to a next action only after stating the rule or physical dependency that warrants the connection. Ask whether it happens always, immediately, only on working days or only after additional information. A payment notification, for example, may report something already done elsewhere rather than perform it here. For uncertain external behaviour, show the waiting and failure outcome instead of drawing an assured success.

Track one object through the relevant events to expose illegal transitions and missing information. For concurrent requests, ask what must be decided together. When exploring software, an aggregate can be a candidate consistency boundary around domain objects whose invariant one operation must preserve. Derive that boundary from behaviour and invariants; it is not a synonym for any important project subject or alpha. A bounded context bounds a particular model and its language. Neither it nor an aggregate determines one service, one database or one team. Compare those architecture choices separately with SYSE.5 and SYSE.6.

Some parts of the domain are conversational: negotiation, diagnosis or design can revisit questions in many orders. Mark that region and the events or conditions allowing it to finish. Model consequential rules and the ordering constraints needed by the decision. If exact concurrency or temporal guarantees matter, return that question to an appropriate formal or specialist method; the workshop model does not prove them.

SYSE.54:4.4 - Challenge the account and produce a usable return

When developing a flow, first complete a simple meaningful path while retaining deferred objections as hot spots. Then choose a variation that could change the model: rejection, interruption, stale information, concurrent demand, external delay or an expired time condition. Use concrete identities and quantities where they expose the rule. Follow every selected branch to a stable result, an explicit waiting condition with its continuation, or a named unresolved question. If the variation defeats the baseline, change the baseline rather than adding exceptions indefinitely.

For behaviour that will be implemented, express decisive examples as initial state and information, triggering action or event, and expected observable outcome. Include a refused or delayed action where it matters. The group should be able to explain why the outcome follows and what would change it. The examples give candidate acceptance conditions. For a claim about implemented behaviour, use evidence from tests performed, observations of the system or qualification appropriate to that claim.

Resolve the hot spots that prevent the receiving use. An open question can go to a source able to answer it, with the decision it affects and the condition for continuing. The authority for a rule may have defined it already, or an operating record may show when a notification arrived. A blocking contradiction leaves the flow in dispute. An exploratory session can preserve what the participants learned and choose a bounded investigation where one is needed.

Keep enough of the account for the work that will use it. Broad discovery can return consequential meanings, disagreements and a grounded next inquiry; process modelling adds the selected flow, rules and variations; software design adds candidate consistency and interface boundaries. In each case preserve the question, scope, grounds, uncertainties and affected engineering use. Preserve participant understanding as well as an accessible description; test whether a receiving practitioner can retell the consequential relation. A photograph alone may omit the discussion that made a note intelligible.

A compatible account can supply a scenario and changed premise to SYSE.2, functional contributions and coordination questions to SYSE.5, or software alternatives to SYSE.6. A hypothesis about current functioning may instead need observation assessed through SYSE.10. Use only the receiving relation that is needed now. Building an event model does not require event-sourced storage, a message broker or a microservice architecture.