4. Continue with realization, configuration, and assurance

The realization Agent applies SYSE.3 to the retained arrangement and identifies its first unsupported realization branch: whether the internal integration Agent can configure the supervisory layer and produce the commissioning evidence before the need date. The vendor controller is a supplied System and the AI Agent is a possible performer in selected Work; neither becomes the whole realization arrangement.

SYSE.13 identifies controller, software, interface, sensor, and greenhouse configuration and effectivity. SYSE.10 keeps the hardware-in-the-loop replay results tied to the claims assessed by that replay. SYSE.4 states which acceptance claims may rely on those observations and which still need greenhouse commissioning evidence. SYSE.14 governs the later change and release decision. Performed integration Work, accepted configuration, payment, provider duty, and changed internal capability remain results of their own Methods.