… declared checks to a gate—under the criterion and the entry conditions required. Not this pattern when. Use A.15.2 for the work plan itself, A.15.3 for planned slot fillers, A.15.1 for dated performed work, A.21 for gate decisions, A.15.4 only when a reliance…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
… resource availability, or resulting performed work. A.15.5 gives the work-entry readiness question a local criterion and result semantics. A readiness judgement is pre-entry unless a recheck after launch or post-launch variance claim is explicitly current. It…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
State readiness as a domain-local result about the identified plan content. When the result needs its own reference, identify its C.2.1 episteme; retain a durable representation when later access requires it. Full-kit use. Use the plan, input facts and…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
A.15.5:2 - Problem
Without one local work-entry readiness claim and result semantics:
Full-kit preparation becomes an umbrella for planning, source relations, gate passage, and performed work.
A green tile or ready label is treated as a GateDecisionResult.…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
A.15.5:9 - Consequences
Benefits:
Teams can inspect work-entry readiness without flattening plan, preparation, gate, resource, and performed-work claims.
The adapted pre-entry Full-Kitting distinctions supply a recognition palette for a local readiness…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
A.15.5:3 - Forces
Force Pressure Work-entry speed Teams need a short readiness result before work entry.
Open-world discipline An input omitted from one criterion is not thereby absent; an unavailable required fact returns unknown unless an applicable…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
Situation: an assisting agent can run a reversible documentation probe to find source-currentness gaps. Use A.15.5 for the probe only if its work-entry decision needs a readiness criterion; an ordinary sufficient reversible probe needs no automatic formal…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
A.15.5:5 - Archetypal Grounding - Worked Slices
The following constructed cases stipulate their project facts and illustrate the separate readiness, occurrence and reliance questions…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
… inputs, the checking Work, gate, permission, or target Work into one object. The result depends on the inputs consumed by its criterion. It may use an immediate A.15.4 disposition without making that note a new formal object. Later reliance needs the claim…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
A.15.5:6 - Bias-Annotation
Ready-label bias. A green tile, ready label, release screen, or commitment board position can look stronger than the recoverable claim. Recover whether the current object is readiness, appearance-based reliance repair under A.15.4,…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
A.15.5:12 - Relations
Builds on: A.15, A.15.1, A.15.2, A.15.3, A.15.4, A.21, B.1.6, E.18, E.18.1, and E.24; consumes current A.2.8.PER grant/non-prohibition/conflict refs as prospective inputs, and exercise/non-violation refs only as evidence about different…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
A.15.5:4.4 - Relation to A.15 Family
Current claim Subject pattern Intended target work and horizon A.15.2 U.WorkPlan.
Planned fillings before work A.15.3 declaration-local planned-filling content inside the U.WorkPlan.
Preparation activity that actually…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
A.15.5:11 - SoTA-Echoing
Source family Bounded source contribution Local adoption Steve Tendon, The Book of TameFlow: Theory of Constraints Applied to Knowledge-Work Management Adapt only the pre-entry Full-Kitting distinctions used to recognize minimum…
In A.15.5 - Work-Entry Readiness and Full-Kit Preparation
When E.18.1 carries accepted problem-side material to a readiness question, E.18.1 names that carry-through relation and cites A.15.5 for the readiness result. When a user needs to know which pattern to use before readiness is current, use E.11.PUR…
In A.15 - System-Role–Method–Work Alignment
Use A.15.5 when the current question is whether intended Work is ready to enter its boundary. A.15 keeps system-role kind, assignment, Method, plan, and Work distinct; A.15.5 carries WorkEntryReadiness@Context, FullKitCondition, commitment disposition,…