A.3.2:5.1 - Industrial procedure
A procedure episteme about EtchAl2O3@FabA qualifies when its claims state how the etching Method is done: gas-feed participant meanings, temperature bounds, chamber preconditions, intended etch profile, failure conditions, operator system-role kind, calibration capability threshold, or admitted parameter ranges.
A PDF publication form may express one edition of those claims, and a PLC ladder representation may correspond to some of them. A U.WorkPlan states the planned maintenance-window preparation; tool run W-143 is Work. A metrology result supports another claim only through the evidence relation for that claim.
Named-use replay — preparing WP-Etch-MW-47. The maintenance planner needs four claims before drafting this A.15.2 U.WorkPlan: the chamber is empty, inert, and leak-check complete before gas feed; the method’s temperature range is 58–62 °C; calibration is no more than 24 hours old; and pressure above the stated bound stops the run. EtchAl2O3-Description-e7 passes A.3.2 membership because it concerns EtchAl2O3@FabA and says how that Method is done. It also states all four needed claims. To verify that this is the current edition, the planner checks its ClaimGraph against publication occurrence Pub-Etch-e7, publication form EtchAl2O3-SOP-e7, and carrier FabA-MethodRepository-2026, plus the source trace from EtchDescriptionReleaseWork-e7, performed under EtchDescriptionMaintainerAssignment-4 with method trace ClaimGraphReleaseCheck-v2. A.10 path EP-Etch-e7-Plan47 links those sources to claim C-Etch-e7-has-Plan47-claims. Its bounded use is citing e7 while drafting WP-Etch-MW-47; unsupported uses are gate passage, authorization, safe execution, and a claim that Work occurred. Its window reopens when e7, RecipeWindow-Al2O3-3, the calibration rule, or a source named in the path changes. RelianceDisposition=pass therefore supports citing e7 only for this drafting use.
EtchAl2O3-Description-brief-e7 still passes membership because it concerns the same Method and states the gas-feed and temperature procedure. It omits the 24-hour calibration condition and pressure stop. A.10 path EP-Etch-brief-e7-Plan47 points to that brief edition and cannot evidence the two missing claims, so RelianceDisposition=blocked-current-use applies to drafting WP-Etch-MW-47. Reopen after selecting an edition that states both claims; until then the planner stops or selects another edition. Membership is unchanged. If the result must persist, C.2.1 is the pattern for its result episteme and ClaimGraph, A.10 is the pattern for the evidence path and disposition, and A.15.2 is the pattern for the plan.