Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 14:36:52 UTC · snapshot created 2026-10-03 14:38:14 UTC · last check 2026-10-03 15:10:10 UTC

B.1.1:5 - Archetypal Grounding (Worked Cases)

B.1.1:5.1 - Plant Supplier

Source graph: PowerGrid -> Plant.

If the edge means electricity supply, recover that exact supply relation. It establishes neither plant parthood nor its absence. Test a separate part-whole claim under the chosen whole’s identity and parthood rules; an independently admitted internal power subsystem can be both a supplier and a part.

B.1.1:5.2 - Digital Twin

Source graph: DigitalTwin -> Turbine.

If the edge means representation, recover the architecture-description, publication, source-use, evidence, or digital-twin relation. The digital twin is not a turbine component by graph adjacency.

B.1.1:5.3 - Work Plan And Work Occurrence

Source graph: Prep -> Weld -> Paint.

If the graph describes a method or process view, use the patterns that define the method, description, and order claims. If it describes performed Work, use A.15.1 with occurrence identity, timing, evidence, and the exact Work relation. Do not let the same graph do both jobs.