B.1.1:5 - Archetypal Grounding (Worked Cases)
B.1.1:5.1 - Plant Supplier
Source graph: PowerGrid -> Plant.
If the edge means electricity supply, recover that exact supply relation. It establishes neither plant parthood nor its absence. Test a separate part-whole claim under the chosen whole’s identity and parthood rules; an independently admitted internal power subsystem can be both a supplier and a part.
B.1.1:5.2 - Digital Twin
Source graph: DigitalTwin -> Turbine.
If the edge means representation, recover the architecture-description, publication, source-use, evidence, or digital-twin relation. The digital twin is not a turbine component by graph adjacency.
B.1.1:5.3 - Work Plan And Work Occurrence
Source graph: Prep -> Weld -> Paint.
If the graph describes a method or process view, use the patterns that define the method, description, and order claims. If it describes performed Work, use A.15.1 with occurrence identity, timing, evidence, and the exact Work relation. Do not let the same graph do both jobs.