Source changed 2026-10-03 16:02:47 UTC · snapshot created 2026-10-03 16:03:51 UTC · last check 2026-10-03 16:45:04 UTC
B.1.6:10 - Relations
Builds on A.13 for actual performers, A.15.1 for independently admitted dated measurement or aggregation Work, F.6 when a result must also identify the assignment under which that Work was performed, and A.6.1 for declarations and actual bindings; C.2.1 governs measurement-result and aggregation-result epistemes.
Coordinates with A.3.1, A.3.2, and A.15.2 for method, method description, and work plan.
Coordinates with A.15.5 for work-entry readiness, full-kit condition, and resource readiness before work entry; B.1.6 may cite those refs but does not decide readiness.
Coordinates with A.15.1 for exact Work temporal parts, episodes, operational parts, overlaps, retries, resumptions, and later occurrences; with B.1.4 only for bounded aggregation of already recovered temporal relations; and with C.27 for temporal-claim adequacy.
Coordinates with A.1, B.1, A.14, and C.13 for holon delimitation, part-whole, proper temporal restriction and PhaseOf for a non-Work carrier, and constructive grounding.
Coordinates with A.3.4 for transformation. Use B.2 for a remaining whole-identity question and B.2.P for unresolved emergence-family wording; the relevant B.2-family pattern defines or constrains the recovered claim.
Coordinates with C.16 for resource Characteristics and measurement results; A.10 and G.6 for provenance; G.11 for currentness; C.29 for representation or mathematical-lens claims; A.15.1 for Work relations; A.14 and B.1.4 for non-Work part or phase relations and their bounded aggregation; E.17 for publication; and the applicable comparison, assurance, transformation, reidentification, or decision pattern when those uses are current.