Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 16:02:47 UTC · snapshot created 2026-10-03 16:03:51 UTC · last check 2026-10-03 16:40:20 UTC

B.2.2:6 - Conformance Checklist

CheckRequirement
CC-B2.2-1B.2 has already left a whole-reidentification question before B.2.2 is used.
CC-B2.2-2B.2’s one exact candidate new whole passes the complete A.1 criterion and is independently recognized under the already admitted U.System kind.
CC-B2.2-3No system-specific result reference, context-shaped slice, or second reidentification record is introduced; any optional durable account remains B.2’s C.2.1 episteme.
CC-B2.2-4Result-system delimitation and crossing relations are named without creating U.Boundary or U.Interaction.
CC-B2.2-5An obtaining supervision or coordination relation is not treated as automatic system recognition, and evidence for it is not treated as safety warrant.
CC-B2.2-6Acting-system participation, transformation, and work are separated from parthood.
CC-B2.2-7Component assurance is not silently transferred to the result system.
CC-B2.2-8Recover the episteme, representation, or publication claim for a description, dashboard, simulation, or digital twin separately from recognition of the operating system it describes, even when that system is the EoC.