B.2.4:5 - Archetypal Grounding (Worked Cases)
B.2.4:5.1 - Production Cell Capability
A milling machine, robot arm, fixture, and inspection station can remain a collection of assets even when a scheduling rule for their use is available. A new production-cell candidate becomes current only when exact capability, functioning, coordination, and transformation-flow facts cannot be explained by any single component or the old aggregate. Cell-level cycle time and tolerance measurements may support the claim; they do not create the candidate or those facts.
Use A.6.F for function-like wording, A.3.4 for transformations, E.18 for transformation-flow structure and C.30.TFS-REL for its bounded architecture use, A.15.1 for performed work, C.16 for cycle-time and tolerance characteristics, and B.2 only when the cell whole must be reidentified.
B.2.4:5.2 - CI/CD Capability
A team may have methods for coding, testing, and releasing. That does not by itself create a new whole. Use the direct Method and Work patterns for the method relations and performed release work.
B.2.4 becomes current only if exact capability, coordination, commitment, and work facts leave a result-holon question that the existing team or platform cannot explain. Evidence may support that claim; an automated delivery label or score does not decide the ontology.
B.2.4:5.3 - Theory Explains New Phenomena
A new theory may explain phenomena that the source portfolio did not explain. Use B.2.4 to bring the exact explanatory-use facts into B.2’s ordinary existing-whole comparison, while evidence separately supports or challenges the claim about that use. This does not assign an A.2.2 capability to the episteme. B.2.3 supplies the episteme-result specialization if the exact candidate is U.Episteme; C.2.1 defines its constitution; C.29 handles any mathematical-lens use.